Use the permit lookup · Compare towns
Do You Need a Permit in DeForest?
Yes permit neededNo no permitDepends depends on the workAsk not published, call the office
| Project | Permit | What the rule says |
|---|---|---|
| Kitchen remodel | Depends | A kitchen remodel is remodeling, which the Village lists as needing a building permit. New wiring needs an electrical permit (only replacing broken sockets, switches or receptacles is exempt), and plumbing changes need a plumbing permit. Swapping cabinets or counters with no other work isn't addressed; ask permits@deforestwi.gov. Permits: building, electrical, plumbing.(source) |
| Bathroom remodel | Depends | A bathroom remodel needs a building permit as remodeling, plus a plumbing permit for new or moved piping and an electrical permit for new circuits or a new fan. Minor faucet repairs and clearing stoppages are not 'plumbing' under the code. A like-for-like fixture swap isn't addressed; ask the Village. Permits: building, plumbing, electrical.(source) |
| Finish a basement | Yes | Finishing a basement is an interior alteration that needs a building permit, with separate electrical, plumbing and HVAC permits for that work. The fee schedule bills residential remodels by square foot. Permits: building, electrical, plumbing, HVAC.(source) |
| Remove or move a wall | Yes | Removing or moving walls alters the building, and the code requires a permit before any building is altered. Load-bearing and non-load-bearing walls are not treated differently. Permits: building.(source) |
| Build or replace a deck | Yes | New and replacement decks need a building permit ($0.66 per sq ft, $190 minimum) and a site map with setbacks. Open, unroofed decks may reach the accessory-building setback (5 ft from side and rear lot lines in residential districts); a roofed or enclosed deck must meet the house setbacks. No height or size exemption is published. Permits: building, zoning.(source) |
| Replace deck boards or railings | Depends | Replacing a whole deck needs a permit. Replacing boards or railings in kind isn't addressed by the Village; ask permits@deforestwi.gov. Permits: building.(source) |
| Replace windows, same size | Depends | Same-size window replacement under $1,500 needs no general building permit. Over $1,500, the fee schedule lists a $35 permit for siding, windows or similar alterations with no structural change. Permits: building.(source) |
| New or larger window (egress) | Yes | Cutting a new or bigger opening alters the structure, so it needs a building permit; the $35 window permit covers only work with no structural changes. Permits: building.(source) |
| Replace exterior doors | Depends | Exterior doors aren't named. The fee schedule's $35 permit covers 'siding, windows or similar alterations' over $1,500 with no structural changes, which likely includes door replacement; confirm with the Village. Permits: building.(source) |
| Re-roof | No | The Village lists roof replacement or repairs among projects that don't need a general building permit. Tear-off vs overlay and sheathing are not addressed. Permits: building.(source) |
| Replace siding | Depends | Re-siding is named as needing a permit; the fee schedule charges $35 for siding work over $1,500 with no structural changes. Work under $1,500 isn't addressed. Permits: building.(source) |
| New flooring | Ask | Flooring isn't mentioned. The Village says interior alterations need a permit but doesn't say whether new flooring counts; ask permits@deforestwi.gov. |
| Replace a water heater | Yes | Not named on the permit page, but the code treats installing gas, heating or plumbing equipment that affects safety as new construction, which needs a permit. The fee schedule has residential plumbing permits ($115 with inspection, $55 admin-only); ask which applies. Permits: plumbing.(source) |
| Build a fence | Yes | Fences need a permit ($80) and a site map. In residential districts fences may be up to 6 ft along side and rear lot lines but may not go into the front setback (landscape features up to 4 ft are allowed there), and nothing over 3 ft within 25 ft of a street corner. Posts face in, finished side out. Fences may go in utility easements. Permits: building, zoning.(source) |
| Build a shed | Yes | Sheds need a permit ($80 up to 200 sq ft). In residential districts a shed up to 200 sq ft is permitted; a larger accessory building (other than a garage up to 625 sq ft per unit) needs a conditional use permit except in RM-4. Max height 12 ft in most residential districts (15 ft in RE and RH), at least 5 ft from side and rear lot lines and from the house, no more than 2 detached accessory buildings, and none in easements. Permits: building, zoning.(source) |
| Install a pool | Depends | A building permit is required for in-ground and above-ground pools that need a permanent or hardwired utility connection ($300 in-ground, $100 above-ground). Pools need a 4 ft fence or wall with locked gates, a raised deck with a 36 in railing, or a locking safety cover; storable pools are exempt from that. All pools go in the side or rear yard, at least the accessory-building setback from lot lines. Permits: building, electrical, zoning.(source) |
| Add a hot tub | Depends | Spas and hot tubs are exempt from the pool barrier rules, and no hot tub permit is listed. Hardwired electrical work needs an electrical permit. The pool section puts all pools, exempt ones included, in the side or rear yard. Permits: electrical, zoning.(source) |
| Build a pergola or gazebo | Yes | The fee schedule lists a $45 pergola permit. A pergola counts as an accessory structure for setbacks (5 ft from side and rear lot lines in residential districts). Permits: building, zoning.(source) |
| Backyard fire pit | No | No permit for recreational fires. Rules: an adult must watch the fire; portable fire pits must be listed or approved and kept 10 ft from buildings and structures; other fires 25 ft away; noncombustible surface; dry firewood only; fuel no bigger than 3 ft across and 2 ft high. Burning grass or yard waste needs a Fire Inspector permit. Permits: fire.(source) |
| Build a patio | Yes | The fee schedule lists a $45 patio permit. Patios count as impervious surface toward the lot's minimum green space (for example 60% in RN-1 and RN-2), and open patios may reach the accessory-building setback. Permits: building, zoning.(source) |
Checked October 2026 against the Village of DeForest sources listed below.
Who to Call
Village of DeForest Building and Zoning Permits
Phone: 608-846-6751
Email: permits@deforestwi.gov
Permit office website
Apply online through the village's CivicReview portal. Decks, sheds, fences, driveways and other outdoor projects need a site map with the project's dimensions and setback measurements. Allow 10 business days for approval. Inspections are done by General Engineering Company, the village's contracted inspector.
Permit Fees
| Fee | Amount | Notes |
|---|---|---|
| Remodel and addition | ||
| Remodel or repair | $0.33 per sq ft | $165 minimum, plus mechanical; + $75 plan review |
| Addition or large accessory structure | $0.33 per sq ft | $220 minimum; + $75 plan review + $110 erosion control |
| Deck | $0.66 per sq ft | $190 minimum |
| Shed or accessory building under 200 sq ft | $80 | |
| Shed or accessory building over 200 sq ft | $0.19 per sq ft | $190 minimum |
| Trades | ||
| Electrical | $170 | |
| Plumbing | $115 with inspection | $55 admin only |
| HVAC | $115 with inspection | $55 admin only |
| Residential solar | $375 | |
| Small projects | ||
| Fence | $80 | |
| Siding, windows or similar over $1,500 | $35 | |
| Patio | $45 | |
| Pergola | $45 | |
| Plumbing (small job) | $35 | |
| Interior demolition | $110 per area | |
| Pools | ||
| In-ground pool | $300 | |
| Above-ground pool | $100 | |
| Other | ||
| Re-inspection | $90 | |
| Permit extension | $30 | |
- Posted fee schedule (the 'Fees (PDF)' link). The file is titled 'effective January 1, 2023' but is marked Resolution 2026-102, which was on the Aug 18, 2026 Village Board agenda.
- Work started before a permit pays double.
Source: Village of DeForest (fee schedule)
Worth Knowing in DeForest
- A permit lapses if work doesn't start within 6 months or isn't finished within 1 year; one 6-month extension is allowed.(source)
- Owners may pull their own electrical permit, and a plumbing permit for a single-family home they own and live in; otherwise a licensed master plumber must.(source)
- Homes in Conservancy Place, Diamond Village, Fox Hills Estates, Heritage Gardens, Hidden Hills, Savannah Brooks and The Meadows may need HOA approval for exterior changes; a copy must go with the permit application.(source)
- Permanent structures can't go in a utility, drainage or stormwater easement or within a 75-ft wetland buffer; fences may go in utility easements.(source)
- One- and two-family projects under the state Uniform Dwelling Code are exempt from the Village erosion control permit unless they disturb more than an acre; other land disturbance over 4,000 sq ft (or on slopes over 12%) needs one.(source)
- The Village has its own floodplain (Ch. 21, recreated by Ord. 2025-014) and shoreland-wetland (Ch. 25) zoning; a floodplain zoning permit is $150.(source)
- In the extraterritorial zoning area (parts of the Towns of Burke and Vienna), the Village issues a separate zoning permit.(source)
More about living in DeForest: property tax rate and due dates, utilities, trash pickup and schools.
Other Towns
- City of Madison
- City of Middleton
- City of Fitchburg
- City of Monona
- Village of Shorewood Hills
- City of Sun Prairie
- City of Verona
- Village of McFarland
- Village of Maple Bluff
- Village of Waunakee
- City of Stoughton
- Village of Oregon
- Village of Cottage Grove
- Village of Mount Horeb
- Village of Windsor
- Village of Cross Plains
- Village of Marshall
- Village of Cambridge
- Village of Deerfield
Sources
- deforestwi.gov/559/Apply-for-a-Building-Permit
- deforestwi.gov/190/Building-and-Zoning-Permits
- deforestwi.gov/DocumentCenter/View/324/Fees-for-Building-and-Development-effective-January-1-2023-PDF
- deforestwi.gov/DocumentCenter/View/2287/Resolution-2026-038-Establishing-Fees-for-Building-Permits-and-Inspections-in-the-Village-of-DeForest-PDF
- deforestwi.gov/DocumentCenter/View/85/Chapter-14-Building-Regulations-PDF
- deforestwi.gov/DocumentCenter/View/86/Chapter-15-Zoning-Code-Recodified-51326-PDF
- deforestwi.gov/DocumentCenter/View/96/Chapter-5-Fire-Protection-and-Prevention-Code-PDF
- deforestwi.gov/DocumentCenter/View/103/Chapter-24-Erosion-Control-and-Storm-Water-Management-PDF
- deforestwi.gov/DocumentCenter/View/105/Chapter-21-Floodplain-Zoning-Regulations-PDF
- deforestwi.gov/DocumentCenter/View/100/Chapter-25-Shoreland-Zoning-PDF
- deforestwi.gov/160/Municipal-Code-of-Ordinances
- deforestwi.granicus.com/AgendaViewer.php?view_id=1&event_id=67
- deforestwi.gov/DocumentCenter/View/1247/Ordinance-2024-021-Issuance-of-Building-Permits-PDF
Permit rules and fees change. We checked each answer against the town's own website, code or fee schedule in October 2026 and linked the source. Confirm with the permit office before you start. This is a guide, not legal advice.